Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,345
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0337 # 06 Y:2006 | 06 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $2,233 | $760 | Implemented |
WV0337 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,082 | $590 | Implemented |
WV0337 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,981 | $80 | Implemented |
WV0337 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,846 | $2,185 | Not Implemented |
WV0337 # 10 Y:2006 | 10 | 2006 | USE SYNTHETIC LUBRICANT | $1,777 | $0 | Implemented |
WV0337 # 11 Y:2006 | 11 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,749 | $2,400 | Not Implemented |
WV0337 # 12 Y:2006 | 12 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,100 | $1,308 | Not Implemented |
WV0337 # 13 Y:2006 | 13 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $674 | $1,280 | Implemented |
UD0738 # 01 Y:2006 | 01 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $91,800 | $6,000 | Implemented |
UD0738 # 02 Y:2006 | 02 | 2006 | RECOVER AND REUSE WASTE MATERIAL | $28,944 | $2,000 | Not Implemented |
UD0738 # 03 Y:2006 | 03 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $8,313 | $0 | Implemented |
UD0738 # 04 Y:2006 | 04 | 2006 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,084 | $0 | Implemented |
UD0738 # 05 Y:2006 | 05 | 2006 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,819 | $0 | Not Implemented |
UD0738 # 06 Y:2006 | 06 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,479 | $1,700 | Not Implemented |
UD0738 # 07 Y:2006 | 07 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,348 | $500 | Implemented |
UD0738 # 08 Y:2006 | 08 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $859 | $0 | Implemented |
UD0738 # 09 Y:2006 | 09 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $658 | $500 | Implemented |
UD0738 # 10 Y:2006 | 10 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $401 | $0 | Not Implemented |
UD0738 # 11 Y:2006 | 11 | 2006 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $382 | $459 | Implemented |
UD0738 # 12 Y:2006 | 12 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $89 | $400 | Not Implemented |
SD0379 # 01 Y:2006 | 01 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $212,485 | $900,288 | Not Implemented |
SD0379 # 02 Y:2006 | 02 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $169,122 | $0 | Not Implemented |
SD0379 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $110,534 | $160,385 | Not Implemented |
SD0379 # 04 Y:2006 | 04 | 2006 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $82,170 | $150,000 | Not Implemented |
SD0379 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,140 | $18,110 | Not Implemented |