Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,456
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0110 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $6,850 | $13,700 | Not Implemented |
TA0110 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,925 | $0 | Not Implemented |
TA0110 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,880 | $1,080 | Not Implemented |
TA0110 # 05 Y:2005 | 05 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,083 | $5,319 | Not Implemented |
TA0110 # 06 Y:2005 | 06 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,362 | $0 | Not Implemented |
TA0110 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $969 | $262 | Not Implemented |
UM0293 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,861 | $18,165 | Implemented |
UM0293 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,506 | $175 | Implemented |
UM0293 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,085 | $50 | Implemented |
UM0293 # 04 Y:2005 | 04 | 2005 | OPTIMIZE PLANT POWER FACTOR | $3,999 | $2,728 | Not Implemented |
UM0293 # 05 Y:2005 | 05 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,239 | $0 | Not Implemented |
UM0293 # 06 Y:2005 | 06 | 2005 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $227 | $200 | Implemented |
AS0410 # 01 Y:2005 | 01 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $7,503 | $6,000 | Not Implemented |
AS0410 # 02 Y:2005 | 02 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,150 | $6,600 | Not Implemented |
AS0410 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,623 | $100 | Implemented |
AS0410 # 04 Y:2005 | 04 | 2005 | USE PHOTOCELL CONTROLS | $0 | $5,538 | Implemented |
AS0410 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,056 | $1,000 | Implemented |
AS0410 # 06 Y:2005 | 06 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,603 | $7,200 | Not Implemented |
AS0410 # 07 Y:2005 | 07 | 2005 | USE SOLAR HEAT TO HEAT WATER | $591 | $3,200 | Not Implemented |
AS0410 # 08 Y:2005 | 08 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $103 | $689 | Not Implemented |
SD0372 # 01 Y:2005 | 01 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,522 | $12,000 | Not Implemented |
SD0372 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,816 | $2,580 | Not Implemented |
SD0372 # 03 Y:2005 | 03 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,082 | $6,984 | Not Implemented |
SD0372 # 04 Y:2005 | 04 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,072 | $11,250 | Not Implemented |
SD0372 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,173 | $140 | Implemented |