IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0623 # 15 Y:2022 15 2022 UPGRADE CONTROLS ON COMPRESSORS $1,341 $4,835 Implemented
WV0623 # 16 Y:2022 16 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $313 $1,500 Not Implemented
AM0848 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,136 $13 Not Implemented
AM0848 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,821 $1,000 Implemented
AM0848 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $889 $1,568 Implemented
AM0848 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $149 $408 Implemented
LS2218 # 01 Y:2022 01 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $21,720 $0 Implemented
LS2218 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $3,196 $100 Implemented
LS2218 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $535 $90 Implemented
LS2218 # 04 Y:2022 04 2022 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $12,800 $2,600 Not Implemented
LS2218 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,084 $800 Not Implemented
LS2218 # 06 Y:2022 06 2022 IMPROVE SPACE COMFORT CONDITIONING $11,310 $17,640 Not Implemented
LS2218 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,287 $38,480 Implemented
LS2218 # 08 Y:2022 08 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $78,203 $201,075 Not Implemented
LS2218 # 09 Y:2022 09 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $1,482 $4,700 Not Implemented
LS2218 # 10 Y:2022 10 2022 CONVERT TO ROBOTIC PAINTING $37,576 $140,000 Not Implemented
OK1070 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $2,809 $9,600 Not Implemented
OK1070 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,329 $0 Implemented
OK1070 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,014 $990 Implemented
OK1070 # 04 Y:2022 04 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,689 $3,294 Not Implemented
OK1070 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $2,659 $8,954 Implemented
OK1070 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,927 $3,985 Not Implemented
OK1070 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,761 $4,884 Not Implemented
OK1070 # 08 Y:2022 08 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,533 $440 Not Implemented
UF0577 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,354 $640 Implemented