Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,301
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0306 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $274,832 | $1,429,458 | n/a |
UF0617 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,700 | $322,608 | n/a |
UF0617 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,015 | $12,416 | n/a |
UF0617 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,599 | $49,000 | n/a |
UF0617 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,230 | $5,280 | n/a |
UF0617 # 05 Y:2024 | 05 | 2024 | REDUCE GLAZED AREAS IN BUILDINGS | $1,046 | $1,720 | n/a |
UF0617 # 06 Y:2024 | 06 | 2024 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $890,327 | $117,000 | n/a |
UF0617 # 07 Y:2024 | 07 | 2024 | AUTOMATE FINISHING PROCESS | $74,880 | $100,000 | n/a |
UF0617 # 08 Y:2024 | 08 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $904 | $1,752 | n/a |
UD1086 # 11 Y:2024 | 11 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,817 | $0 | n/a |
UD1086 # 10 Y:2024 | 10 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,429 | $25,300 | n/a |
UD1086 # 09 Y:2024 | 09 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,459 | $7,620 | n/a |
UD1086 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,780 | $0 | n/a |
UD1086 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,965 | $1,068 | n/a |
UD1086 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $561 | $0 | n/a |
UD1086 # 05 Y:2024 | 05 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,962 | $7,238 | n/a |
UD1086 # 04 Y:2024 | 04 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,233 | $0 | n/a |
UD1086 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $54 | $0 | n/a |
UD1086 # 02 Y:2024 | 02 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $573 | $0 | n/a |
UD1086 # 01 Y:2024 | 01 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,814 | $0 | n/a |
MI0442 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,002 | $70 | n/a |
MI0442 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,918 | $917 | n/a |
MI0442 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,720 | $159,280 | n/a |
MI0442 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,876 | $16,028 | n/a |
MI0442 # 02 Y:2024 | 02 | 2024 | METER WASTE WATER | $13,483 | $956 | n/a |