IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0582 # 07 Y:2017 07 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,603 $500 Implemented
NC0582 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,895 $100 Not Implemented
NC0582 # 09 Y:2017 09 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,470 $4,500 Not Implemented
NC0582 # 10 Y:2017 10 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,578 $500 Implemented
NC0582 # 11 Y:2017 11 2017 DEVELOP A REPAIR/REPLACE POLICY $1,782 $5,865 Implemented
NC0582 # 12 Y:2017 12 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,886 $4,100 Not Implemented
BD0494 # 01 Y:2017 01 2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,894 $18,000 n/a
BD0494 # 02 Y:2017 02 2017 USE RADIANT HEATER FOR SPOT HEATING $5,446 $12,000 n/a
BD0494 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $2,169 $1,950 n/a
BD0494 # 04 Y:2017 04 2017 USE PHOTOCELL CONTROLS $2,112 $3,000 n/a
BD0494 # 05 Y:2017 05 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,978 $4,040 n/a
BD0494 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,456 $3,960 n/a
BD0494 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $803 $21 n/a
BD0494 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $300 n/a
BD0494 # 09 Y:2017 09 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $294 $550 n/a
BD0494 # 10 Y:2017 10 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $260 $600 n/a
UD0960 # 01 Y:2017 01 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,202 $0 Implemented
UD0960 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,385 $0 Implemented
UD0960 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $10,808 $0 Implemented
UD0960 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,390 $1,000 Implemented
UD0960 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,273 $0 Implemented
UD0960 # 06 Y:2017 06 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $514 $1,425 Implemented
UD0960 # 07 Y:2017 07 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,266 $3,000 Not Implemented
UD0960 # 08 Y:2017 08 2017 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $11,351 $10,000 Not Implemented
UD0960 # 09 Y:2017 09 2017 REDUCE EXCESSIVE BOILER BLOWDOWN $5,234 $7,500 Not Implemented