IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0533 # 11 Y:2016 11 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,697 $300 Implemented
WV0533 # 12 Y:2016 12 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,004 $2,230 Implemented
WV0533 # 13 Y:2016 13 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $770 $2,150 Implemented
WV0533 # 14 Y:2016 14 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $558 $0 Implemented
WV0533 # 15 Y:2016 15 2016 INSULATE BARE EQUIPMENT $218 $470 Implemented
UM0472 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,171 $1,000 n/a
UM0472 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,743 $18,830 n/a
UM0472 # 03 Y:2016 03 2016 ADD AREA LIGHTING SWITCHES $22,157 $2,680 n/a
UM0472 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $9,915 $12,000 n/a
AM0712 # 01 Y:2016 01 2016 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $48,140 $2,710 Not Implemented
AM0712 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,510 $46,840 Not Implemented
AM0712 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $11,700 $26,740 Not Implemented
AM0712 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,710 $30 Not Implemented
AM0712 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $200 Not Implemented
AM0712 # 06 Y:2016 06 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $400 $0 Not Implemented
AM0712 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $150 Not Implemented
AM0712 # 08 Y:2016 08 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $110 $280 Not Implemented
CO0726 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $1,630 n/a
CO0726 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $380 $660 n/a
CO0726 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,470 $36,440 n/a
CO0726 # 04 Y:2016 04 2016 BURN WASTE OIL FOR HEAT $5,380 $5,270 n/a
BS0076 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $14,626 $14,109 Not Implemented
BS0076 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $5,025 $2,777 Implemented
BS0076 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,367 $1,665 Implemented
BS0076 # 04 Y:2016 04 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $962 $14 Implemented