Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2317 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,763 | $17,190 | Not Implemented |
UC2317 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $321,413 | $2,701,940 | Not Implemented |
UC2317 # 09 Y:2023 | 09 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $30,659 | $188,853 | Not Implemented |
UC2317 # 12 Y:2023 | 12 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,411 | $0 | Not Implemented |
UC2317 # 08 Y:2023 | 08 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,409 | $34,609 | Not Implemented |
UC2317 # 06 Y:2023 | 06 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $714 | $540 | Not Implemented |
UC2317 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,240 | $50 | Not Implemented |
UC2317 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,584 | $1,300 | Not Implemented |
UC2317 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,123 | $428 | Not Implemented |
UC2317 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $392 | $75 | Not Implemented |
UC2317 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $90,350 | $29,189 | Not Implemented |
UC2317 # 10 Y:2023 | 10 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $6,903 | $1,468 | Not Implemented |
UC2315 # 08 Y:2023 | 08 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,601 | $25,290 | n/a |
UC2315 # 13 Y:2023 | 13 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $10,809 | $60,198 | n/a |
UC2315 # 12 Y:2023 | 12 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $9,576 | $41,370 | n/a |
UC2315 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,189 | $268,543 | n/a |
UC2315 # 10 Y:2023 | 10 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $3,746 | $34,025 | n/a |
UC2315 # 09 Y:2023 | 09 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $5,665 | $31,002 | n/a |
UC2315 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $1,770 | $559 | n/a |
UC2315 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,231 | $150 | n/a |
UC2315 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $75 | n/a |
UC2315 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $323 | $855 | n/a |
UC2315 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,868 | $11,165 | n/a |
UC2315 # 02 Y:2023 | 02 | 2023 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $354 | $222 | n/a |
UC2315 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $269 | $0 | n/a |