IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1087 # 07 Y:2023 07 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,468 $72,450 Implemented
OK1087 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,321 $11,550 Implemented
OK1087 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $71,142 $168,192 Implemented
OK1087 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,963 $2,426 Not Implemented
OK1087 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,173 $0 Not Implemented
OK1087 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,063 $2,450 Not Implemented
OK1087 # 01 Y:2023 01 2023 USE RADIANT HEATER FOR SPOT HEATING $18,209 $91,432 Implemented
OK1084 # 03 Y:2023 03 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,393 $6,035 Not Implemented
OK1084 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,015 $4,620 Not Implemented
OK1084 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $28,652 $258,706 Not Implemented
OK1080 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $403,296 $1,097,180 Not Implemented
OK1080 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,094 $6,745 Not Implemented
OK1080 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $22,737 $3,000 Not Implemented
OK1080 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,757 $5,295 Implemented
OK1080 # 05 Y:2023 05 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $21,682 $4,810 Implemented
OK1080 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $21,187 $25,000 Implemented
OK1070 # 04 Y:2022 04 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,689 $3,294 Not Implemented
OK1070 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,761 $4,884 Not Implemented
OK1070 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $2,659 $8,954 Implemented
OK1070 # 08 Y:2022 08 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,533 $440 Not Implemented
OK1070 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,927 $3,985 Not Implemented
OK1070 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $2,809 $9,600 Not Implemented
OK1070 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,329 $0 Implemented
OK1070 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,014 $990 Implemented
OK1068 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,103 $0 Implemented