Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0227 # 10 Y:2023 | 10 | 2023 | MINIMIZE WATER USAGE | $2,457 | $2,652 | n/a |
UU0227 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,564 | $7,061 | n/a |
UU0227 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,776 | $3,465 | n/a |
UU0227 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,358 | $13,337 | n/a |
UU0227 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,103 | $7,349 | n/a |
UU0227 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,325 | $78,840 | n/a |
UU0227 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,169 | $10,776 | n/a |
UU0227 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,399 | $40,790 | n/a |
UU0227 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $4,289 | $9,282 | n/a |
UU0227 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,237 | $6,000 | n/a |
UU0227 # 11 Y:2023 | 11 | 2023 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $2,160 | $2,000 | n/a |
UU0227 # 12 Y:2023 | 12 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $53 | $333 | n/a |
UU0220 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,986 | $13,500 | Implemented |
UU0220 # 01 Y:2023 | 01 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $67,069 | $0 | Implemented |
UU0220 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $920 | $1,200 | Implemented |
UU0220 # 05 Y:2023 | 05 | 2023 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,160 | $50 | Implemented |
UU0220 # 03 Y:2023 | 03 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,450 | $3,366 | Not Implemented |
UU0220 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,245 | $3,810 | Not Implemented |
UU0208 # 01 Y:2022 | 01 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $9,375 | $9,500 | Not Implemented |
UU0208 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $230 | $107 | Implemented |
UU0208 # 05 Y:2022 | 05 | 2022 | INSTALL SKYLIGHTS | $3,058 | $10,560 | Not Implemented |
UU0208 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,292 | $7,290 | Implemented |
UU0208 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $4,445 | $12,840 | Implemented |
UU0208 # 02 Y:2022 | 02 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,476 | $127,045 | Implemented |
UU0138 # 05 Y:2018 | 05 | 2018 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $615 | $0 | Implemented |