IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

547

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0240 # 09 Y:2006 09 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $21,764 $230 Implemented
CO0577 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $135,890 $303,800 Implemented
CO0577 # 03 Y:2005 03 2005 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $89,400 $41,000 Implemented
CO0577 # 04 Y:2005 04 2005 MODIFY WORKLOAD $48,020 $360 Implemented
CO0577 # 05 Y:2005 05 2005 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $3,420 $6,000 Implemented
CO0577 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $270 $340 Implemented
LL0228 # 01 Y:2005 01 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $79,796 $4,000 Implemented
LL0228 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,819 $22,000 Implemented
LL0228 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,945 $0 Implemented
LL0228 # 11 Y:2005 11 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $106,500 $20,000 Implemented
LL0228 # 12 Y:2005 12 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $80,610 $20,000 Implemented
LL0219 # 01 Y:2005 01 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $49,904 $26,850 Implemented
LL0219 # 02 Y:2005 02 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $38,931 $18,717 Implemented
LL0219 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,142 $60 Implemented
LL0219 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,865 $3,360 Implemented
LL0219 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,372 $570 Implemented
LL0219 # 08 Y:2005 08 2005 USE PHOTOCELL CONTROLS $1,919 $180 Implemented
LL0219 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,270 $1,581 Implemented
LL0219 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $695 $525 Implemented
LL0219 # 12 Y:2005 12 2005 RECOVER AND REUSE WASTE MATERIAL $11,259 $18,500 Implemented
LL0219 # 13 Y:2005 13 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $184,840 $1,190 Implemented
LL0219 # 14 Y:2005 14 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,250 $1,486 Implemented
IA0360 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,348 $526 Implemented
IA0360 # 06 Y:2005 06 2005 INSTALL STORM WINDOWS AND DOORS $2,828 $4,371 Implemented
IA0360 # 07 Y:2005 07 2005 MAINTAIN MACHINES TO REDUCE LEAKS $656 $147 Implemented