Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsNAICS | 3331 | Agriculture, Construction, and Mining Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0262 # 03 Y:2022 | 03 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,351 | $33,110 | Not Implemented |
IC0262 # 02 Y:2022 | 02 | 2022 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $356 | $5,338 | Not Implemented |
IC0262 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,327 | $4,150 | Not Implemented |
BD0470 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,593 | $7,220 | Not Implemented |
BD0470 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,232 | $500 | Not Implemented |
BD0470 # 11 Y:2015 | 11 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $185 | $200 | Not Implemented |
BD0470 # 10 Y:2015 | 10 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $305 | $450 | Not Implemented |
BD0470 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $911 | $1,575 | Not Implemented |
BD0470 # 08 Y:2015 | 08 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $997 | $450 | Not Implemented |
BD0470 # 07 Y:2015 | 07 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,041 | $20 | Not Implemented |
BD0470 # 06 Y:2015 | 06 | 2015 | USE PHOTOCELL CONTROLS | $1,063 | $950 | Not Implemented |
BD0470 # 05 Y:2015 | 05 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,984 | $2,500 | Not Implemented |
BD0470 # 01 Y:2015 | 01 | 2015 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $26,090 | $30,000 | Not Implemented |
BD0470 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,298 | $5,241 | Not Implemented |
BD0455 # 12 Y:2015 | 12 | 2015 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $157,388 | $8,500 | Not Implemented |
BD0455 # 10 Y:2015 | 10 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $845 | $2,500 | Not Implemented |
BD0455 # 08 Y:2015 | 08 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,994 | $900 | Implemented |
BD0455 # 11 Y:2015 | 11 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $839 | $725 | Implemented |
BD0455 # 09 Y:2015 | 09 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,388 | $25 | Implemented |
BD0455 # 01 Y:2015 | 01 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $140,934 | $105,000 | Not Implemented |
BD0455 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,997 | $40,950 | Implemented |
BD0455 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,322 | $13,700 | Implemented |
BD0455 # 04 Y:2015 | 04 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $11,689 | $17,188 | Not Implemented |
BD0455 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $6,580 | $2,250 | Implemented |
BD0455 # 05 Y:2015 | 05 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $7,295 | $25 | Implemented |