IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0340 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,531 $5,336 Implemented
MZ0340 # 07 Y:2023 07 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $188,061 $900,000 Not Implemented
MZ0340 # 06 Y:2023 06 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,084 $18,000 Not Implemented
MZ0340 # 05 Y:2023 05 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,940 $4,520 Not Implemented
MZ0340 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $618 $260 Implemented
MZ0340 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,810 $3,202 Not Implemented
MZ0340 # 02 Y:2023 02 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,688 $320 Implemented
MZ0340 # 01 Y:2023 01 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,529 $720 Implemented
MZ0266 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,437 $17,755 Implemented
MZ0266 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $12,385 $4,900 Not Implemented
MZ0266 # 05 Y:2019 05 2019 USE SYNTHETIC LUBRICANT $221 $0 Implemented
MZ0266 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,435 $5,500 Not Implemented
MZ0266 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $343 $0 Implemented
MZ0266 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $630 $1,240 Not Implemented
MZ0206 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $376 $0 Implemented
MZ0206 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,082 $2,600 Implemented
MZ0206 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,931 $890 Implemented
MZ0206 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,668 $6,475 Not Implemented
MZ0008 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,856 $21,050 Implemented
MZ0008 # 02 Y:2007 02 2007 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $44,772 $6,399 Implemented
MZ0008 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,289 $800 Implemented
MZ0008 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $694 $1,300 Implemented
MZ0008 # 05 Y:2007 05 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $812 $0 Implemented
MZ0008 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22 $23 Implemented