Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
595
matching recommendationsNAICS | 3331 | Agriculture, Construction, and Mining Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0608 # 02 Y:2013 | 02 | 2013 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $107,138 | $55,641 | Implemented |
OR0608 # 04 Y:2013 | 04 | 2013 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $11,970 | $41,000 | Not Implemented |
OR0608 # 03 Y:2013 | 03 | 2013 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $125,546 | $300,000 | Not Implemented |
OR0608 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $518 | $135 | Not Implemented |
OR0608 # 01 Y:2013 | 01 | 2013 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $32,340 | $0 | Implemented |
OR0608 # 07 Y:2013 | 07 | 2013 | USE PHOTOCELL CONTROLS | $658 | $966 | Not Implemented |
OR0608 # 06 Y:2013 | 06 | 2013 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $2,698 | $1,220 | Not Implemented |
BD0428 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,903 | $1,400 | Not Implemented |
BD0428 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,273 | $3,150 | Not Implemented |
BD0428 # 07 Y:2013 | 07 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,310 | $2,000 | Implemented |
BD0428 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $4,430 | $2,257 | Not Implemented |
BD0428 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,563 | $20 | Not Implemented |
BD0428 # 03 Y:2013 | 03 | 2013 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,262 | $15,000 | Implemented |
BD0428 # 02 Y:2013 | 02 | 2013 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $31,849 | $76,000 | Not Implemented |
BD0428 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,115 | $39,240 | Implemented |
BS0014 # 01 Y:2013 | 01 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,378 | $1,732 | Not Implemented |
BS0014 # 03 Y:2013 | 03 | 2013 | HEAT WATER WITH EXHAUST HEAT | $7,448 | $7,432 | Not Implemented |
BS0014 # 09 Y:2013 | 09 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $190 | $180 | Not Implemented |
BS0014 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $79 | $324 | Not Implemented |
BS0014 # 08 Y:2013 | 08 | 2013 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $621 | $299 | Not Implemented |
BS0014 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $94 | $230 | Not Implemented |
BS0014 # 05 Y:2013 | 05 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,647 | $48,320 | Not Implemented |
BS0014 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,556 | $523 | Not Implemented |
BS0014 # 04 Y:2013 | 04 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,948 | $14,095 | Not Implemented |
UA0099 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $109,678 | $164,833 | Not Implemented |