IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 333111 Farm Machinery and Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0523 # 06 Y:2006 06 2006 USE SYNTHETIC LUBRICANT $1,970 $0 Implemented
WI0523 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,735 $800 Not Implemented
WI0523 # 04 Y:2006 04 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,880 $0 Not Implemented
WI0523 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,347 $1,000 Implemented
WI0523 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,911 $52,320 Not Implemented
WI0523 # 01 Y:2006 01 2006 IMPROVE SPACE COMFORT CONDITIONING $58,800 $3,000 Not Implemented
IA0391 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $186 $198 Not Implemented
IA0391 # 07 Y:2006 07 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $804 $600 Implemented
IA0391 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $5,577 $349 Not Implemented
IA0391 # 05 Y:2006 05 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,668 $12,865 Not Implemented
IA0391 # 04 Y:2006 04 2006 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $3,433 $1,735 Implemented
IA0391 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $136 $89 Implemented
IA0391 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,991 $410 Implemented
UD0741 # 01 Y:2006 01 2006 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $65,250 $10,000 Not Implemented
UD0741 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,883 $133,640 Not Implemented
UD0741 # 03 Y:2006 03 2006 INSTALL TIMERS AND/OR THERMOSTATS $18,067 $110 Implemented
UD0741 # 04 Y:2006 04 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $16,240 $0 Implemented
UD0741 # 05 Y:2006 05 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,135 $2,800 Implemented
UD0741 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,387 $3,150 Not Implemented
UD0741 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,802 $840 Implemented
UD0741 # 08 Y:2006 08 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,097 $0 Implemented
UD0741 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,261 $0 Implemented