Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 33312 | Construction Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0051 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,050 | $225 | Implemented |
WM0051 # 03 Y:2014 | 03 | 2014 | INSULATE BARE EQUIPMENT | $2,736 | $800 | Not Implemented |
WM0051 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $15,358 | $6,250 | Not Implemented |
WM0051 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,648 | $27,260 | Implemented |
WM0051 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,680 | $3,200 | Not Implemented |
WM0051 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,680 | $5,175 | Not Implemented |
WM0051 # 07 Y:2014 | 07 | 2014 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $9,345 | $35,000 | Not Implemented |
WM0051 # 08 Y:2014 | 08 | 2014 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $14,378 | $3,000 | Not Implemented |
WM0051 # 09 Y:2014 | 09 | 2014 | REPLACE BOILER | $11,306 | $16,000 | Implemented |
NC0517 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $74,398 | $162,227 | Implemented |
NC0517 # 13 Y:2014 | 13 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $525 | $160 | Not Implemented |
NC0517 # 12 Y:2014 | 12 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $1,458 | $4,256 | Not Implemented |
NC0517 # 11 Y:2014 | 11 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,806 | $5,000 | Not Implemented |
NC0517 # 10 Y:2014 | 10 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,346 | $200 | Implemented |
NC0517 # 09 Y:2014 | 09 | 2014 | INSTALL COMMON HEADER ON COMPRESSORS | $9,004 | $8,600 | Not Implemented |
NC0517 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,395 | $100 | Implemented |
NC0517 # 07 Y:2014 | 07 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,941 | $5,000 | Not Implemented |
NC0517 # 06 Y:2014 | 06 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,090 | $12,500 | Not Implemented |
NC0517 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,506 | $15,200 | Not Implemented |
NC0517 # 04 Y:2014 | 04 | 2014 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $6,998 | $2,000 | Not Implemented |
NC0517 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,226 | $215,258 | Implemented |
NC0517 # 01 Y:2014 | 01 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $18,930 | $1,250 | Implemented |
UK1402 # 01 Y:2014 | 01 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,710 | $4,500 | Not Implemented |
UK1402 # 05 Y:2014 | 05 | 2014 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $34,700 | $40,000 | Not Implemented |
UK1402 # 06 Y:2014 | 06 | 2014 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,409 | $0 | Not Implemented |