IAC Assessment: NC0517
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0517
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2014
Principal Product Trucks
NAICS 333120 - Construction Machinery Manufacturing
SIC 3713 - Truck And Bus Bodies
Sales >$500,000,000
# of Employees 2,500
Plant Area (Sq.Ft.) 1,300,000
Annual Production 27,000 Pieces
Production Hrs. Annual 4,500
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,247,975 55,545,600 kWh $0.04
Electricity Demand $1,210,965 135,594 kW-months/year $8.93
Electricity Fees $8,533 - $ -
Natural Gas $1,448,941 247,626 MMBtu $5.85
TOTAL ENERGY COSTS $5,354,264
RECOMMENDED SAVINGS* $194,623 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $151,295
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$18,930
Cost:
$1,250
$18,930 467,418 - - - - - - - - - - $18,930
467,418
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$74,398
Cost:
$162,227
$37,066 915,210 $16,347 1,830 - - - - - - $20,985 - $37,066
915,210
kWh
$16,347
1,830
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$20,985
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$47,226
Cost:
$215,258
$32,772 809,190 $14,454 1,618 - - - - - - - - $32,772
809,190
kWh
$14,454
1,618
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$6,998
Cost:
$2,000
- - - - - - $6,998 449 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,998
449
Tgal
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,506
Cost:
$15,200
- - - - $5,506 941 - - - - - - -
-
kWh
-
-
kW-months/year
$5,506
941
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,090
Cost:
$12,500
- - - - $5,090 870 - - - - - - -
-
kWh
-
-
kW-months/year
$5,090
870
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,941
Cost:
$5,000
- - - - $3,941 674 - - - - - - -
-
kWh
-
-
kW-months/year
$3,941
674
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,395
Cost:
$100
$8,158 201,420 $4,797 537 - - - - $(-3,360) - $(-1,200) - $8,158
201,420
kWh
$4,797
537
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-3,360)
-
$
$(-1,200)
-
$
09: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$9,004
Cost:
$8,600
$5,672 140,045 $3,332 373 - - - - - - - - $5,672
140,045
kWh
$3,332
373
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
10: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,346
Cost:
$200
$540 - $1,806 187 - - - - - - - - $540
-
kWh
$1,806
187
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
11: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$10,806
Cost:
$5,000
$4,469 110,250 $6,337 710 - - - - - - - - $4,469
110,250
kWh
$6,337
710
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
12: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,458
Cost:
$4,256
$918 22,666 $540 60 - - - - - - - - $918
22,666
kWh
$540
60
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$525
Cost:
$160
$173 4,275 $53 6 - - - - - - $299 - $173
4,275
kWh
$53
6
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$299
-
$
TOTAL RECOMMENDED Savings:
$194,623
Cost:
$431,751
$108,698 2,670,474 $47,666 5,321 $14,537 2,485 $6,998 449 $(-3,360) - $20,084 - $108,698
2,670,474
kWh
$47,666
5,321
kW-months/year
$14,537
2,485
MMBtu
$6,998
449
Tgal
$(-3,360)
-
$
$20,084
-
$
TOTAL IMPLEMENTED Savings:
$151,295
Cost:
$379,035
$97,466 2,393,238 $37,404 4,172 - - - - $(-3,360) - $19,785 - $97,466
2,393,238
kWh
$37,404
4,172
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-3,360)
-
$
$19,785
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost