IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
NAICS 33313 Mining and Oil and Gas Field Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1068 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,103 $0 Implemented
OK1068 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,325 $5,412 Implemented
OK1068 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,561 $18,463 Not Implemented
OK1068 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $830 $0 Not Implemented
OK1068 # 03 Y:2022 03 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,553 $3,192 Implemented
OK1068 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,141 $1,208 Implemented
OK1064 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,414 $774 Implemented
OK1064 # 01 Y:2022 01 2022 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,509 $2,061 Not Implemented
OK1064 # 03 Y:2022 03 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $367 $700 Implemented
OK1064 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,321 $22,000 Implemented
OK1024 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,608 $4,500 Not Implemented
OK1024 # 05 Y:2020 05 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,437 $3,178 Not Implemented
OK1024 # 06 Y:2020 06 2020 INSTALL TIMERS AND/OR THERMOSTATS $34,324 $2,448 Not Implemented
OK1024 # 02 Y:2020 02 2020 RECOVER WASTE HEAT FROM EQUIPMENT $6,084 $2,187 Not Implemented
OK1024 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,729 $0 Not Implemented
OK1024 # 04 Y:2020 04 2020 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $515 $540 Not Implemented
OK1007 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,238 $0 Not Implemented
OK1007 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $390 $1,047 Not Implemented
OK1007 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $2,995 $1,980 Not Implemented
OK1007 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,929 $3,017 Not Implemented
OK1007 # 05 Y:2019 05 2019 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $96,866 $35,244 Not Implemented
OK0966 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,570 $17,250 Implemented
OK0966 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $7,886 $0 Not Implemented
OK0966 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74,450 $305,694 Implemented
OK0966 # 01 Y:2017 01 2017 REPLACE BOILER $125,000 $442,000 Not Implemented