IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

177

matching recommendations
Reset
NAICS 333131 Mining Machinery and Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0008 # 05 Y:2007 05 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $812 $0 Implemented
MZ0008 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22 $23 Implemented
TA0129 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,250 $1,944 Implemented
TA0129 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,372 $0 Not Implemented
TA0129 # 03 Y:2006 03 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $10,615 $0 Implemented
TA0129 # 04 Y:2006 04 2006 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $940 $300 Not Implemented
TA0129 # 05 Y:2006 05 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $48,887 $0 Implemented
TA0123 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $148,735 $46,560 Not Implemented
TA0123 # 02 Y:2006 02 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $13,420 $0 Implemented
TA0123 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,565 $780 Implemented
TA0123 # 04 Y:2006 04 2006 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,515 $340 Implemented
UF0338 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,833 $376 Implemented
UF0338 # 02 Y:2004 02 2004 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $17,356 $246 Not Implemented
UF0338 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,636 $15,747 Not Implemented
UF0338 # 04 Y:2004 04 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,517 $20,000 Not Implemented
UF0338 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,081 $0 Not Implemented
UF0338 # 06 Y:2004 06 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,607 $200 Not Implemented
UF0338 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,694 $7,494 Not Implemented
UF0338 # 08 Y:2004 08 2004 METER WASTE WATER $1,403 $1,500 Not Implemented
WI0449 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,913 $47,600 Not Implemented
WI0449 # 02 Y:2003 02 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,417 $29,500 Not Implemented
WI0449 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,045 $0 Not Implemented
WI0449 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $16,308 $2,000 Not Implemented
WI0449 # 05 Y:2003 05 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $5,783 $15,000 Not Implemented
WI0449 # 06 Y:2003 06 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $5,589 $0 Not Implemented