IAC Assessment: WI0449
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0449
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2003
Principal Product Aggregate Processing Equipment
NAICS 333131 - Mining Machinery and Equipment Manufacturing
SIC 3532 - Mining Machinery
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 200,000
Annual Production 150 Pieces
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,170 4,930,726 kWh $0.03
Electricity Demand $105,108 10,156 kW-months/year $10.35
Electricity Fees $30,396 - $ -
Natural Gas $146,343 31,868 MMBtu $4.59
TOTAL ENERGY COSTS $448,085
RECOMMENDED SAVINGS* $88,008 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,913
Cost:
$47,600
$16,362 482,664 $10,551 965 - - - - - - $16,362
482,664
kWh
$10,551
965
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$16,417
Cost:
$29,500
$6,285 185,400 $10,132 927 - - - - - - $6,285
185,400
kWh
$10,132
927
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$14,045
Cost:
-
- - $14,045 1,492 - - - - - - -
-
kWh
$14,045
1,492
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$16,308
Cost:
$2,000
- - - - $16,308 3,060 - - - - -
-
kWh
-
-
kW-months/year
$16,308
3,060
MMBtu
-
-
gal
-
-
$
05: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$5,783
Cost:
$15,000
- - - - $(-881) (-192) $6,664 13,328 - - -
-
kWh
-
-
kW-months/year
$(-881)
(-192)
MMBtu
$6,664
13,328
gal
-
-
$
06: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS Savings:
$5,589
Cost:
-
- - - - - - - - $5,589 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$5,589
-
$
07: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$2,048
Cost:
$3,500
$2,048 60,426 - - - - - - - - $2,048
60,426
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$905
Cost:
$640
$610 17,995 - - $295 27 - - - - $610
17,995
kWh
-
-
kW-months/year
$295
27
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$88,008
Cost:
$98,240
$25,305 746,485 $34,728 3,384 $15,722 2,895 $6,664 13,328 $5,589 - $25,305
746,485
kWh
$34,728
3,384
kW-months/year
$15,722
2,895
MMBtu
$6,664
13,328
gal
$5,589
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Ancillary Material Cost