IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 333131 Mining Machinery and Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0155 # 10 Y:2020 10 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $360 $0 Implemented
WM0155 # 09 Y:2020 09 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $366 $1,250 Implemented
WM0155 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $451 $750 Not Implemented
WM0155 # 07 Y:2020 07 2020 USE PHOTOCELL CONTROLS $541 $1,075 Not Implemented
WM0155 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,679 $1,750 Not Implemented
WM0155 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,761 $3,855 Not Implemented
WM0155 # 04 Y:2020 04 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,791 $15,060 Not Implemented
WM0155 # 03 Y:2020 03 2020 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,335 $1,700 Not Implemented
WM0155 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,927 $8,716 Not Implemented
WM0155 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $26,709 $110,788 Not Implemented
WM0131 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,086 $4,750 Implemented
WM0131 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $455 $600 Not Implemented
WM0131 # 08 Y:2019 08 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,915 $0 Implemented
WM0131 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,069 $1,500 Implemented
WM0131 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,174 $15,938 Not Implemented
WM0131 # 04 Y:2019 04 2019 USE SYNTHETIC LUBRICANT $14,757 $10,000 Implemented
WM0131 # 03 Y:2019 03 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $18,069 $5,612 Implemented
WM0131 # 02 Y:2019 02 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $18,168 $105,757 Not Implemented
WM0131 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $33,801 $0 Not Implemented
WI0449 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,913 $47,600 Not Implemented
WI0449 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $905 $640 Not Implemented
WI0449 # 07 Y:2003 07 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,048 $3,500 Not Implemented
WI0449 # 06 Y:2003 06 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $5,589 $0 Not Implemented
WI0449 # 05 Y:2003 05 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $5,783 $15,000 Not Implemented
WI0449 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $16,308 $2,000 Not Implemented