IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 3332 Industrial Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0249 # 05 Y:2021 05 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,067 $0 Implemented
IC0249 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,062 $18,089 Not Implemented
IC0249 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,949 $440 Implemented
IC0249 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,374 $4,100 Implemented
IC0249 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,457 $154 Not Implemented
IP0128 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,334 $76 Implemented
IP0128 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,549 $36,977 Implemented
IP0128 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $2,633 $1,575 Implemented
IP0128 # 03 Y:2019 03 2019 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $1,067 $66 Not Implemented
IP0128 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $331 $0 Implemented
IP0118 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,045 $2,439 Not Implemented
IP0118 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,021 $10,215 Implemented
IP0118 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,954 $824 Implemented
IP0118 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,154 $1,526 Implemented
IP0045 # 05 Y:2015 05 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,201 $17,250 Implemented
IP0045 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,242 $417 Implemented
IP0045 # 03 Y:2015 03 2015 BURN A LESS EXPENSIVE GRADE OF FUEL $25,783 $1,054 Implemented
IP0045 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $401 $0 Implemented
IP0045 # 01 Y:2015 01 2015 APPLY FOR INVESTMENT INCENTIVES $1,605 $0 Implemented
IP0024 # 06 Y:2014 06 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $479 $1,050 Not Implemented
IP0024 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $281 $561 Not Implemented
IP0024 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $542 $603 Not Implemented
IP0024 # 04 Y:2014 04 2014 OPTIMIZE PLANT POWER FACTOR $15,670 $13,000 Not Implemented
IP0024 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $1,916 $284 Not Implemented
IP0024 # 02 Y:2014 02 2014 APPLY FOR INVESTMENT INCENTIVES $2,460 $147 Implemented