Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
110
matching recommendationsNAICS | 3332 | Industrial Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0610 # 10 Y:2024 | 10 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $15,675 | $25,000 | n/a |
UF0610 # 08 Y:2024 | 08 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $1,315 | $4,000 | n/a |
UF0610 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,012 | $25,400 | n/a |
UF0610 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $4,345 | $2,330 | n/a |
UF0610 # 09 Y:2024 | 09 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $54,895 | $0 | n/a |
UF0610 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $108,899 | $322,608 | n/a |
UF0610 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $28,883 | $18,333 | n/a |
UF0610 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $9,119 | $36,000 | n/a |
UF0610 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,062 | $7,200 | n/a |
UF0610 # 06 Y:2024 | 06 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,691 | $5,108 | n/a |
UF0610 # 11 Y:2024 | 11 | 2024 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $4,482 | $3,330 | n/a |
MI0423 # 06 Y:2023 | 06 | 2023 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,580 | $1,455 | Not Implemented |
MI0423 # 08 Y:2023 | 08 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,131 | $1,500 | Implemented |
MI0423 # 09 Y:2023 | 09 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $1,771 | $900 | Not Implemented |
MI0423 # 05 Y:2023 | 05 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,196 | $27,500 | Not Implemented |
MI0423 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,808 | $580 | Implemented |
MI0423 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $41,834 | $0 | Implemented |
MI0423 # 10 Y:2023 | 10 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $277 | $1,360 | Implemented |
MI0423 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $4,508 | $1,250 | Implemented |
MI0423 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,513 | $51,984 | Implemented |
MI0423 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,785 | $37,678 | Implemented |
MI0272 # 06 Y:2015 | 06 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,714 | $2,680 | Not Implemented |
MI0272 # 08 Y:2015 | 08 | 2015 | USE PHOTOCELL CONTROLS | $1,053 | $360 | Not Implemented |
MI0272 # 11 Y:2015 | 11 | 2015 | USE OPTIMUM THICKNESS INSULATION | $88 | $360 | Not Implemented |
MI0272 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $1,059 | $373 | Not Implemented |