IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

727

matching recommendations
Reset
NAICS 33324 Industrial Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0942 # 03 Y:2020 03 2020 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $14,945 $4,781 Not Implemented
GT0942 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,179 $71,763 Not Implemented
GT0942 # 05 Y:2020 05 2020 MINIMIZE WATER USAGE $3,202 $5,700 Not Implemented
GT0942 # 06 Y:2020 06 2020 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $113,048 $690,000 Not Implemented
GT0942 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $114,607 $699,103 Not Implemented
IP0128 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $331 $0 Implemented
IP0128 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,334 $76 Implemented
IP0128 # 03 Y:2019 03 2019 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $1,067 $66 Not Implemented
IP0128 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $2,633 $1,575 Implemented
IP0128 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,549 $36,977 Implemented
OR0726 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,581 $7,570 Implemented
OR0726 # 02 Y:2019 02 2019 REDUCE VENTILATION AIR $1,259 $0 Implemented
OR0726 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $3,031 $3,570 Not Implemented
LS1909 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $442 $25 Not Implemented
LS1909 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,322 $1,222 Implemented
LS1909 # 03 Y:2019 03 2019 REPAIR AND ELIMINATE STEAM LEAKS $2,121 $585 Implemented
LS1909 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $980 $320 Not Implemented
LS1909 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $447 $300 Not Implemented
LS1909 # 06 Y:2019 06 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $651 $635 Not Implemented
IC0218 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,997 $8,799 Not Implemented
IC0218 # 02 Y:2019 02 2019 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $63,690 $6,300 Not Implemented
IC0218 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,151 $14,700 Not Implemented
IC0218 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,883 $8,244 Not Implemented
MZ0276 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $155 $60 Implemented
MZ0276 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $249 $1,040 Implemented