Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
90
matching recommendationsNAICS | 33324 | Industrial Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0207 # 05 Y:2015 | 05 | 2015 | ELIMINATE/REDUCE AN OPERATION | $149 | $0 | Implemented |
MZ0207 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,096 | $1,500 | Not Implemented |
MZ0207 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,538 | $880 | Implemented |
MZ0207 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,482 | $3,430 | Implemented |
MZ0207 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,485 | $27,300 | Implemented |
BS0066 # 06 Y:2015 | 06 | 2015 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $13,061 | $19,065 | Not Implemented |
BS0066 # 05 Y:2015 | 05 | 2015 | COMBINE UTILITY METERS | $258 | $253 | Not Implemented |
BS0066 # 04 Y:2015 | 04 | 2015 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,249 | $80 | Not Implemented |
BS0066 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,219 | $907 | Not Implemented |
BS0066 # 02 Y:2015 | 02 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,531 | $26 | Not Implemented |
BS0066 # 01 Y:2015 | 01 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,458 | $568 | Not Implemented |
BS0066 # 08 Y:2015 | 08 | 2015 | MINIMIZE WATER USAGE | $702 | $5,938 | Not Implemented |
BS0066 # 07 Y:2015 | 07 | 2015 | OPTIMIZE PLANT POWER FACTOR | $12,093 | $25,245 | Not Implemented |
UK1509 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,334 | $0 | Not Implemented |
UK1509 # 12 Y:2015 | 12 | 2015 | METER WASTE WATER | $1,872 | $464 | Not Implemented |
UK1509 # 06 Y:2015 | 06 | 2015 | USE ONLY CERTIFIED MOTOR REPAIR SHOPS | $178 | $0 | Implemented |
UK1509 # 08 Y:2015 | 08 | 2015 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,869 | $10,000 | Implemented |
UK1509 # 03 Y:2015 | 03 | 2015 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $218 | $0 | Implemented |
UK1509 # 11 Y:2015 | 11 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,014 | $1,858 | Implemented |
UK1509 # 01 Y:2015 | 01 | 2015 | INSTALL OCCUPANCY SENSORS | $1,084 | $1,708 | Not Implemented |
UK1509 # 10 Y:2015 | 10 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,561 | $1,306 | Not Implemented |
UK1509 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,421 | $1,200 | Not Implemented |
UK1509 # 07 Y:2015 | 07 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,118 | $800 | Implemented |
UK1509 # 15 Y:2015 | 15 | 2015 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $5,579 | $4,086 | Implemented |
UK1509 # 09 Y:2015 | 09 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,895 | $4,000 | Implemented |