Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 333241 | Food Product Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0347 # 09 Y:2004 | 09 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $244 | $0 | Implemented |
IA0347 # 08 Y:2004 | 08 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $29,440 | $50,000 | Not Implemented |
IA0347 # 07 Y:2004 | 07 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,967 | $148 | Implemented |
IA0347 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $929 | $457 | Implemented |
IA0347 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $1,911 | $1,820 | Implemented |
IA0347 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,115 | $14 | Not Implemented |
IA0347 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,623 | $920 | Implemented |
IA0347 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,243 | $1,090 | Implemented |
IA0347 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,608 | $2,591 | Implemented |
TA0082 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,970 | $0 | Not Implemented |
UD0706 # 10 Y:2004 | 10 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $42 | $0 | Not Implemented |
TA0082 # 06 Y:2004 | 06 | 2004 | REDUCE HEAT GAIN BY WINDOW TINTING | $2,820 | $7,720 | Not Implemented |
UD0706 # 01 Y:2004 | 01 | 2004 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $144,536 | $30,000 | Not Implemented |
UD0706 # 02 Y:2004 | 02 | 2004 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $18,275 | $40,280 | Not Implemented |
UD0706 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,881 | $6,152 | Not Implemented |
UD0706 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,779 | $570 | Not Implemented |
UD0706 # 05 Y:2004 | 05 | 2004 | REDUCE SCRAP PRODUCTION | $5,291 | $1,000 | Not Implemented |
UD0706 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,549 | $500 | Not Implemented |
UD0706 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,205 | $2,106 | Not Implemented |
UD0706 # 08 Y:2004 | 08 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $1,883 | $3,883 | Not Implemented |
UD0706 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,558 | $0 | Not Implemented |
TA0082 # 04 Y:2004 | 04 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $1,090 | $0 | Not Implemented |
TA0082 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,170 | $10 | Implemented |
TA0082 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,395 | $960 | Implemented |
TA0082 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $14,730 | $0 | Implemented |