Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
61
matching recommendationsNAICS | 333244 | Printing Machinery and Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1019 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,469 | $10,920 | Not Implemented |
UD1019 # 04 Y:2020 | 04 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $9,326 | $1,400 | Not Implemented |
UD1019 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,619 | $82,620 | Implemented |
UD1019 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,713 | $11,014 | Not Implemented |
UD1019 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,924 | $1,000 | Not Implemented |
UD1019 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,086 | $0 | Not Implemented |
UD1019 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,684 | $0 | Implemented |
UD1019 # 06 Y:2020 | 06 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $21,134 | $7,500 | Not Implemented |
IP0118 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,954 | $824 | Implemented |
IP0118 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,154 | $1,526 | Implemented |
IP0118 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,045 | $2,439 | Not Implemented |
IP0118 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,021 | $10,215 | Implemented |
UD0833 # 16 Y:2011 | 16 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $1,061 | $2,800 | Not Implemented |
UD0833 # 15 Y:2011 | 15 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,435 | $100 | Implemented |
UD0833 # 14 Y:2011 | 14 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,701 | $20,000 | Not Implemented |
UD0833 # 13 Y:2011 | 13 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,754 | $100 | Not Implemented |
UD0833 # 11 Y:2011 | 11 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $83,814 | $10,000 | Not Implemented |
UD0833 # 17 Y:2011 | 17 | 2011 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,107 | $145,390 | Not Implemented |
UD0833 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,026 | $500 | Not Implemented |
UD0833 # 07 Y:2011 | 07 | 2011 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,144 | $600 | Not Implemented |
UD0833 # 02 Y:2011 | 02 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,467 | $25 | Implemented |
UD0833 # 03 Y:2011 | 03 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $24,064 | $1,075 | Not Implemented |
UD0833 # 08 Y:2011 | 08 | 2011 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,523 | $10,500 | Not Implemented |
UD0833 # 10 Y:2011 | 10 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $844 | $50 | Implemented |
UD0833 # 06 Y:2011 | 06 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,343 | $500 | Implemented |