Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
350
matching recommendationsNAICS | 333249 | Other Industrial Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0617 # 06 Y:2024 | 06 | 2024 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $890,327 | $117,000 | n/a |
UF0617 # 05 Y:2024 | 05 | 2024 | REDUCE GLAZED AREAS IN BUILDINGS | $1,046 | $1,720 | n/a |
UF0617 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,015 | $12,416 | n/a |
UF0617 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,230 | $5,280 | n/a |
UF0617 # 08 Y:2024 | 08 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $904 | $1,752 | n/a |
UF0617 # 07 Y:2024 | 07 | 2024 | AUTOMATE FINISHING PROCESS | $74,880 | $100,000 | n/a |
UF0617 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,700 | $322,608 | n/a |
UF0617 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,599 | $49,000 | n/a |
SU0550 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,161 | $0 | n/a |
SU0550 # 06 Y:2024 | 06 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $237 | $50 | n/a |
SU0550 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $129 | $76 | n/a |
SU0550 # 03 Y:2024 | 03 | 2024 | DISCONNECT BALLASTS | $1,547 | $0 | n/a |
SU0550 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $758 | $80 | n/a |
SU0550 # 10 Y:2024 | 10 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,192 | $9,587 | n/a |
SU0550 # 12 Y:2024 | 12 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,567 | $156,925 | n/a |
SU0550 # 08 Y:2024 | 08 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $77 | $75 | n/a |
SU0550 # 11 Y:2024 | 11 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $530 | $847 | n/a |
SU0550 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,137 | $0 | n/a |
SU0550 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,721 | $48 | n/a |
SU0550 # 09 Y:2024 | 09 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $24,107 | $24,000 | n/a |
UF0610 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,062 | $7,200 | n/a |
UF0610 # 11 Y:2024 | 11 | 2024 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $4,482 | $3,330 | n/a |
UF0610 # 10 Y:2024 | 10 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $15,675 | $25,000 | n/a |
UF0610 # 06 Y:2024 | 06 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,691 | $5,108 | n/a |
UF0610 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $108,899 | $322,608 | n/a |