IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 333249 Other Industrial Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0023 # 02 Y:2023 02 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $132,126 $0 Implemented
MU0023 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,416 $480 Implemented
MU0023 # 10 Y:2023 10 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,154 $0 Not Implemented
MU0023 # 09 Y:2023 09 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $83,300 $13,599 Not Implemented
MU0023 # 08 Y:2023 08 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $406 $50 Not Implemented
MU0023 # 07 Y:2023 07 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $7,452 $496 Not Implemented
MU0023 # 06 Y:2023 06 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $50,220 $250,000 Not Implemented
MU0023 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $504 $1,459 Not Implemented
MU0023 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $127,926 $136,639 Implemented
MU0023 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $517 $162 Implemented
UM0380 # 09 Y:2010 09 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $273 $1,400 Not Implemented
UM0380 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,714 $1,500 Not Implemented
UM0380 # 07 Y:2010 07 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,245 $5,500 Not Implemented
UM0380 # 06 Y:2010 06 2010 USE HEAT PUMP FOR SPACE CONDITIONING $7,702 $217,800 Not Implemented
UM0380 # 05 Y:2010 05 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,024 $14,751 Not Implemented
UM0380 # 04 Y:2010 04 2010 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $21,456 $250,000 Not Implemented
UM0380 # 03 Y:2010 03 2010 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $30,357 $350,000 Not Implemented
UM0380 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $861 $3,000 Not Implemented
UM0380 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $2,880 $2,484 Not Implemented
UM0363 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $542 $1,568 Implemented
UM0363 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $2,173 $1,375 Implemented
UM0363 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,241 $1,000 Implemented
UM0363 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,792 $200 Not Implemented
UM0363 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $7,516 $500 Not Implemented
UM0363 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,498 $10,000 Implemented