IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
NAICS 33331 Commercial and Service Industry Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0215 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,090 $0 Not Implemented
IC0215 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $386 $2,006 Not Implemented
IC0215 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,317 $10,297 Not Implemented
IC0215 # 01 Y:2019 01 2019 REPLACE BOILER $18,625 $2,250 Not Implemented
WM0096 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,885 $59,248 Implemented
WM0096 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $238 $576 Not Implemented
WM0096 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $280 $242 Implemented
WM0096 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $418 $1,015 Not Implemented
WM0096 # 07 Y:2016 07 2016 USE PHOTOCELL CONTROLS $428 $396 Not Implemented
WM0096 # 06 Y:2016 06 2016 USE RADIANT HEATER FOR SPOT HEATING $869 $1,230 Not Implemented
WM0096 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $606 $2,250 Not Implemented
WM0096 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $910 $0 Not Implemented
WM0096 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,504 $1,270 Not Implemented
WM0096 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,510 $5,375 Implemented
BD0264 # 05 Y:2004 05 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,766 $1,550 Not Implemented
BD0264 # 04 Y:2004 04 2004 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $2,232 $3,600 Implemented
BD0264 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,433 $60 Implemented
BD0264 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,965 $200 Implemented
BD0264 # 01 Y:2004 01 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $7,724 $2,816 Not Implemented
BD0264 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $547 $182 Implemented
BD0264 # 12 Y:2004 12 2004 AUTOMATE PAYROLL SYSTEM $2,500 $3,000 Implemented
BD0264 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $353 $345 Implemented
BD0264 # 10 Y:2004 10 2004 INSTALL OCCUPANCY SENSORS $282 $600 Implemented
BD0264 # 13 Y:2004 13 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $2,800 $432 Implemented
BD0264 # 15 Y:2004 15 2004 USE POWER DURING OFF-PEAK PERIODS $1,019 $1,300 Not Implemented