Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 333318 | Other Commercial and Service Industry Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0241 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,800 | $24,622 | Implemented |
SU0241 # 08 Y:2006 | 08 | 2006 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $10,784 | $19,571 | Not Implemented |
SU0241 # 07 Y:2006 | 07 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $602 | $712 | Not Implemented |
SU0241 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $290 | $239 | Not Implemented |
SU0241 # 05 Y:2006 | 05 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,054 | $2,928 | Implemented |
SU0241 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $765 | $201 | Implemented |
SU0241 # 03 Y:2006 | 03 | 2006 | CONVERT TO ELECTROSTATIC POWDER COATING | $15,419 | $4,500 | Not Implemented |
SU0241 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,985 | $0 | Not Implemented |
SU0241 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $19 | $0 | Implemented |
UF0382 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $1,971 | $1,275 | Not Implemented |
UF0382 # 14 Y:2006 | 14 | 2006 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,240 | $8,000 | Not Implemented |
UF0382 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,024 | $7,567 | Not Implemented |
UF0382 # 05 Y:2006 | 05 | 2006 | ADD AREA LIGHTING SWITCHES | $515 | $2,079 | Not Implemented |
UF0382 # 06 Y:2006 | 06 | 2006 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $21,646 | $1,350 | Not Implemented |
UF0382 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $1,876 | $571 | Not Implemented |
UF0382 # 08 Y:2006 | 08 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,305 | $1,000 | Not Implemented |
UF0382 # 09 Y:2006 | 09 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $393 | $0 | Not Implemented |
UF0382 # 10 Y:2006 | 10 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,973 | $0 | Not Implemented |
UF0382 # 11 Y:2006 | 11 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,029 | $3,200 | Not Implemented |
UF0382 # 12 Y:2006 | 12 | 2006 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $6,821 | $0 | Not Implemented |
UF0382 # 13 Y:2006 | 13 | 2006 | RECYCLE FLUORESCENT LAMPS | $342 | $3,237 | Not Implemented |
UF0382 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,902 | $900 | Not Implemented |
UF0382 # 01 Y:2006 | 01 | 2006 | USE PHOTOCELL CONTROLS | $4,721 | $2,760 | Not Implemented |
AS0414 # 03 Y:2006 | 03 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $17,731 | $200 | Implemented |
AS0414 # 02 Y:2006 | 02 | 2006 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $28,518 | $20,000 | Implemented |