IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

917

matching recommendations
Reset
NAICS 3334 Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0973 # 06 Y:2017 06 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $860 $769 Not Implemented
OK0973 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,356 $19,135 Not Implemented
OK0973 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,658 $1,650 Not Implemented
OK0973 # 09 Y:2017 09 2017 RECOVER WASTE HEAT FROM EQUIPMENT $8,097 $991 Not Implemented
OK0973 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,050 $510 Not Implemented
OK0973 # 11 Y:2017 11 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,046 $1,480 Not Implemented
OK0973 # 12 Y:2017 12 2017 OPTIMIZE PLANT POWER FACTOR $17,217 $17,024 Not Implemented
SU0447 # 01 Y:2017 01 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,318 $0 Implemented
SU0447 # 02 Y:2017 02 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,262 $0 Implemented
SU0447 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $2,546 $588 Implemented
SU0447 # 04 Y:2017 04 2017 ELIMINATE/REDUCE AN OPERATION $4,758 $1,724 Implemented
SU0447 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $730 $685 Implemented
SU0447 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,427 $18,304 Implemented
SU0447 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $631 $1,080 Implemented
SU0447 # 08 Y:2017 08 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $224 $903 Implemented
MZ0230 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,978 $27,450 Implemented
MZ0230 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,308 $0 Implemented
MZ0230 # 03 Y:2017 03 2017 MINIMIZE WATER USAGE $199 $30 Implemented
MZ0230 # 04 Y:2017 04 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,896 $6,500 Not Implemented
MZ0230 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $3,927 $1,050 Implemented
MI0305 # 01 Y:2016 01 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $21,479 $10,875 Not Implemented
MI0305 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,453 $13,550 Not Implemented
MI0305 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,922 $1,700 Implemented
MI0305 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,269 $19,877 Not Implemented
MI0305 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,903 $1,473 Not Implemented