IAC Assessment: NC0647
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0647
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2020
Principal Product Non-woven filter media
NAICS 333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 118,578
Annual Production 28,800 Thousand Feet
Production Hrs. Annual 4,200
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,088 1,590,428 kWh $0.06
Electricity Demand $92,754 10,348 kW-months/year $8.96
Electricity Fees $4,127 - $ -
Natural Gas $75,754 10,322 MMBtu $7.34
TOTAL ENERGY COSTS $263,723
RECOMMENDED SAVINGS* $160,716 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,099
Cost:
$20,000
$6,208 107,028 $6,891 321 - - - - - - $6,208
107,028
kWh
$6,891
321
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,488
Cost:
$5,708
$2,488 42,897 - - - - - - - - $2,488
42,897
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$192
Cost:
$135
$159 2,749 $168 8 - - $(-120) - $(-15) - $159
2,749
kWh
$168
8
kW-months/year
-
-
MMBtu
$(-120)
-
$
$(-15)
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$20,880
Cost:
$5,000
- - $20,880 1,200 - - - - - - -
-
kWh
$20,880
1,200
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$124,057
Cost:
$600,000
$46,400 800,000 $103,200 4,800 $(-25,543) (-3,480) - - - - $46,400
800,000
kWh
$103,200
4,800
kW-months/year
$(-25,543)
(-3,480)
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$160,716
Cost:
$630,843
$55,255 952,674 $131,139 6,329 $(-25,543) (-3,480) $(-120) - $(-15) - $55,255
952,674
kWh
$131,139
6,329
kW-months/year
$(-25,543)
(-3,480)
MMBtu
$(-120)
-
$
$(-15)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost