Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
958
matching recommendationsNAICS | 3334 | Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0058 # 03 Y:2016 | 03 | 2016 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $30,281 | $6,819 | Not Implemented |
IP0058 # 04 Y:2016 | 04 | 2016 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $11,137 | $4,626 | Not Implemented |
IP0058 # 05 Y:2016 | 05 | 2016 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $227 | $255 | Not Implemented |
IP0058 # 06 Y:2016 | 06 | 2016 | OPTIMIZE PLANT POWER FACTOR | $46,574 | $102,745 | Not Implemented |
NC0548 # 01 Y:2015 | 01 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,830 | $85,000 | Not Implemented |
NC0548 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,922 | $5,000 | Not Implemented |
NC0548 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,958 | $6,100 | Implemented |
NC0548 # 04 Y:2015 | 04 | 2015 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,478 | $7,000 | Not Implemented |
NC0548 # 05 Y:2015 | 05 | 2015 | INCREASE AMOUNT OF CONDENSATE RETURNED | $6,019 | $1,500 | Implemented |
NC0548 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,418 | $7,500 | Not Implemented |
NC0548 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $708 | $100 | Implemented |
NC0548 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,444 | $100 | Not Implemented |
NC0548 # 09 Y:2015 | 09 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,904 | $4,258 | Implemented |
NC0548 # 10 Y:2015 | 10 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,585 | $281 | Implemented |
SF0458 # 01 Y:2014 | 01 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $6,859 | $840 | Implemented |
SF0458 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,195 | $0 | Not Implemented |
SF0458 # 03 Y:2014 | 03 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,339 | $0 | Implemented |
SF0458 # 04 Y:2014 | 04 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,582 | $522 | Implemented |
SF0458 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,813 | $30,411 | Not Implemented |
SF0458 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $459 | $1,384 | Implemented |
SF0458 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $1,683 | $6,142 | Not Implemented |
SF0458 # 08 Y:2014 | 08 | 2014 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $3,900 | $0 | Implemented |
SF0458 # 09 Y:2014 | 09 | 2014 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,360 | $37,774 | Not Implemented |
NC0530 # 01 Y:2014 | 01 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $14,069 | $54,000 | Not Implemented |
NC0530 # 02 Y:2014 | 02 | 2014 | SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS | $1,055 | $0 | Implemented |