Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
917
matching recommendationsNAICS | 3334 | Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0411 # 02 Y:2008 | 02 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $47,620 | $6,301 | Not Implemented |
UF0411 # 01 Y:2008 | 01 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,719 | $4,557 | Not Implemented |
IA0419 # 01 Y:2007 | 01 | 2007 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,302 | $1,140 | Not Implemented |
IA0419 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $678 | $25 | Implemented |
IA0419 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,055 | $500 | Implemented |
IA0419 # 04 Y:2007 | 04 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,431 | $174 | Not Implemented |
IA0419 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $758 | $1,001 | Implemented |
IA0419 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,515 | $7,460 | Not Implemented |
IA0419 # 07 Y:2007 | 07 | 2007 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,450 | $1,200 | Implemented |
IA0419 # 08 Y:2007 | 08 | 2007 | OPTIMIZE PLANT POWER FACTOR | $19,032 | $19,062 | Not Implemented |
IA0419 # 09 Y:2007 | 09 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,583 | $3,300 | Implemented |
IA0419 # 10 Y:2007 | 10 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,325 | $800 | Implemented |
LE0265 # 01 Y:2007 | 01 | 2007 | $45,000 | $7,800 | Implemented | |
LE0265 # 02 Y:2007 | 02 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $10,266 | $2,250 | Implemented |
LE0265 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,608 | $860 | Implemented |
LE0265 # 04 Y:2007 | 04 | 2007 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,367 | $46 | Not Implemented |
LE0265 # 05 Y:2007 | 05 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,558 | $0 | Implemented |
LE0265 # 06 Y:2007 | 06 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $594 | $0 | Implemented |
LE0265 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $623 | $200 | Not Implemented |
LE0265 # 08 Y:2007 | 08 | 2007 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $429 | $600 | Not Implemented |
LE0265 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,557 | $58,273 | Not Implemented |
WV0366 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,251 | $20,735 | Implemented |
WV0366 # 02 Y:2007 | 02 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,342 | $0 | Implemented |
WV0366 # 03 Y:2007 | 03 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,515 | $540 | Not Implemented |
WV0366 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,238 | $5,148 | Implemented |