IAC Assessment: NC0434
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0434
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2011
Principal Product Indoor air quality equipment
NAICS 333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 265,000
Annual Production 25,000 Pieces
Production Hrs. Annual 2,500
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,076 3,198,000 kWh $0.05
Electricity Demand $83,312 9,800 kW-months/year $8.50
Natural Gas $111,682 15,085 MMBtu $7.40
TOTAL ENERGY COSTS $365,070
RECOMMENDED SAVINGS* $37,962 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,005
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,138
Cost:
$2,127
- - - - $3,138 424 - - - - -
-
kWh
-
-
kW-months/year
$3,138
424
MMBtu
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,152
Cost:
$14,895
$1,938 36,443 $1,214 143 - - - - - - $1,938
36,443
kWh
$1,214
143
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,424
Cost:
$1,000
$897 16,866 $527 62 - - - - - - $897
16,866
kWh
$527
62
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$142
Cost:
$100
$357 6,705 $205 24 - - $(-300) - $(-120) - $357
6,705
kWh
$205
24
kW-months/year
-
-
MMBtu
$(-300)
-
$
$(-120)
-
$
05: 2.1224 REPLACE BOILER Savings:
$5,957
Cost:
$26,400
- - - - $5,957 805 - - - - -
-
kWh
-
-
kW-months/year
$5,957
805
MMBtu
-
-
$
-
-
$
06: 2.2514 COVER OPEN TANKS Savings:
$414
Cost:
$908
- - - - $414 56 - - - - -
-
kWh
-
-
kW-months/year
$414
56
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,609
Cost:
$32,453
$11,096 208,658 $8,513 1,002 - - - - - - $11,096
208,658
kWh
$8,513
1,002
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,087
Cost:
$10,660
$1,804 33,915 $1,383 163 - - - - $(-100) - $1,804
33,915
kWh
$1,383
163
kW-months/year
-
-
MMBtu
-
-
$
$(-100)
-
$
09: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE Savings:
$1,039
Cost:
$876
$410 7,710 $629 74 - - - - - - $410
7,710
kWh
$629
74
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$37,962
Cost:
$89,419
$16,502 310,297 $12,471 1,468 $9,509 1,285 $(-300) - $(-220) - $16,502
310,297
kWh
$12,471
1,468
kW-months/year
$9,509
1,285
MMBtu
$(-300)
-
$
$(-220)
-
$
TOTAL IMPLEMENTED Savings:
$32,005
Cost:
$63,019
$16,502 310,297 $12,471 1,468 $3,552 480 $(-300) - $(-220) - $16,502
310,297
kWh
$12,471
1,468
kW-months/year
$3,552
480
MMBtu
$(-300)
-
$
$(-220)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost