IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

958

matching recommendations
Reset
NAICS 33341 Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0058 # 03 Y:2016 03 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $30,281 $6,819 Not Implemented
IP0058 # 04 Y:2016 04 2016 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $11,137 $4,626 Not Implemented
IP0058 # 05 Y:2016 05 2016 USE MAGNETIC TECHNOLOGY TO TREAT WATER $227 $255 Not Implemented
IP0058 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $46,574 $102,745 Not Implemented
NC0548 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $23,830 $85,000 Not Implemented
NC0548 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,922 $5,000 Not Implemented
NC0548 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,958 $6,100 Implemented
NC0548 # 04 Y:2015 04 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,478 $7,000 Not Implemented
NC0548 # 05 Y:2015 05 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $6,019 $1,500 Implemented
NC0548 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,418 $7,500 Not Implemented
NC0548 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $708 $100 Implemented
NC0548 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,444 $100 Not Implemented
NC0548 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $1,904 $4,258 Implemented
NC0548 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,585 $281 Implemented
SF0458 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $6,859 $840 Implemented
SF0458 # 02 Y:2014 02 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,195 $0 Not Implemented
SF0458 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $2,339 $0 Implemented
SF0458 # 04 Y:2014 04 2014 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,582 $522 Implemented
SF0458 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,813 $30,411 Not Implemented
SF0458 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $459 $1,384 Implemented
SF0458 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $1,683 $6,142 Not Implemented
SF0458 # 08 Y:2014 08 2014 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,900 $0 Implemented
SF0458 # 09 Y:2014 09 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,360 $37,774 Not Implemented
NC0530 # 01 Y:2014 01 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $14,069 $54,000 Not Implemented
NC0530 # 02 Y:2014 02 2014 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,055 $0 Implemented