Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsNAICS | 33341 | Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0361 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $86,285 | $59,157 | Implemented |
MS0361 # 02 Y:2010 | 02 | 2010 | BURN A LESS EXPENSIVE GRADE OF FUEL | $28,668 | $57,500 | Not Implemented |
MS0361 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,596 | $322 | Implemented |
MS0361 # 04 Y:2010 | 04 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $851 | $604 | Not Implemented |
OK0800 # 07 Y:2010 | 07 | 2010 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $3,127 | $0 | Not Implemented |
OK0800 # 01 Y:2010 | 01 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,533 | $32,670 | Not Implemented |
OK0800 # 02 Y:2010 | 02 | 2010 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $4,667 | $2,700 | Implemented |
OK0800 # 03 Y:2010 | 03 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $209 | $334 | Implemented |
OK0800 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $860 | $1,865 | Implemented |
OK0800 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,134 | $1,678 | Implemented |
OK0800 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,134 | $706 | Implemented |
OK0796 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $851 | $217 | Not Implemented |
OK0796 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,028 | $14,578 | Implemented |
OK0796 # 01 Y:2010 | 01 | 2010 | OPTIMIZE PLANT POWER FACTOR | $16,798 | $29,735 | Not Implemented |
OK0796 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,129 | $5,526 | Implemented |
OK0796 # 04 Y:2010 | 04 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,660 | $1,378 | Not Implemented |
OK0796 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,383 | $500 | Implemented |
OK0796 # 07 Y:2010 | 07 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,028 | $23,000 | Not Implemented |
OK0796 # 08 Y:2010 | 08 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $786 | $1,850 | Implemented |
UD0822 # 12 Y:2010 | 12 | 2010 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $1,500 | $14,900 | Not Implemented |
UD0822 # 11 Y:2010 | 11 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,147 | $2,100 | Not Implemented |
UD0822 # 08 Y:2010 | 08 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,449 | $500 | Not Implemented |
UD0822 # 06 Y:2010 | 06 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,400 | $2,000 | Not Implemented |
UD0822 # 05 Y:2010 | 05 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $677 | $125 | Not Implemented |
UD0822 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,399 | $8,760 | Not Implemented |