IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 333413 Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0817 # 10 Y:2011 10 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,371 $0 Implemented
OK0817 # 09 Y:2011 09 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,450 $4,260 Not Implemented
OK0817 # 08 Y:2011 08 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,546 $12,837 Not Implemented
OK0817 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,438 $510 Implemented
OK0817 # 02 Y:2011 02 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,812 $1,220 Not Implemented
OK0817 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,613 $2,745 Not Implemented
OK0817 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $728 $2,751 Not Implemented
OK0817 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,469 $55,540 Not Implemented
OK0817 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,965 $47,375 Not Implemented
OK0817 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,011 $23,400 Implemented
TT0077 # 06 Y:2011 06 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,806 $18,000 Not Implemented
TT0077 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,757 $80,684 Not Implemented
TT0077 # 04 Y:2011 04 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $990 $5,400 Not Implemented
TT0077 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,334 $7,975 Not Implemented
TT0077 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $472 $0 Not Implemented
TT0077 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $610 $0 Not Implemented
NC0434 # 09 Y:2011 09 2011 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $1,039 $876 Implemented
NC0434 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,087 $10,660 Implemented
NC0434 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,609 $32,453 Implemented
NC0434 # 06 Y:2011 06 2011 COVER OPEN TANKS $414 $908 Implemented
NC0434 # 05 Y:2011 05 2011 REPLACE BOILER $5,957 $26,400 Not Implemented
NC0434 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $142 $100 Implemented
NC0434 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,424 $1,000 Implemented
NC0434 # 02 Y:2011 02 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,152 $14,895 Implemented
NC0434 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,138 $2,127 Implemented