Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
65
matching recommendationsNAICS | 333414 | Heating Equipment (except Warm Air Furnaces) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0270 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $760 | $200 | Implemented |
MZ0270 # 02 Y:2019 | 02 | 2019 | USE COMPRESSOR AIR FILTERS | $737 | $200 | Implemented |
MZ0270 # 07 Y:2019 | 07 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $19,893 | $18,000 | Implemented |
MZ0270 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,149 | $33,942 | Implemented |
MZ0270 # 06 Y:2019 | 06 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,293 | $0 | Implemented |
SU0447 # 02 Y:2017 | 02 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,262 | $0 | Implemented |
SU0447 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $730 | $685 | Implemented |
SU0447 # 04 Y:2017 | 04 | 2017 | ELIMINATE/REDUCE AN OPERATION | $4,758 | $1,724 | Implemented |
SU0447 # 01 Y:2017 | 01 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $7,318 | $0 | Implemented |
SU0447 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $2,546 | $588 | Implemented |
SU0447 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $631 | $1,080 | Implemented |
SU0447 # 08 Y:2017 | 08 | 2017 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $224 | $903 | Implemented |
SU0447 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,427 | $18,304 | Implemented |
TT0143 # 04 Y:2014 | 04 | 2014 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,178 | $100 | Implemented |
TT0143 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,223 | $75 | Implemented |
MZ0157 # 02 Y:2014 | 02 | 2014 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $1,077 | $10,750 | Implemented |
MZ0157 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,149 | $30,133 | Implemented |
MZ0157 # 05 Y:2014 | 05 | 2014 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $3,840 | $9,600 | Implemented |
TT0130 # 03 Y:2014 | 03 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,677 | $4,500 | Implemented |
TT0130 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $29,307 | $44,000 | Implemented |
TT0130 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,560 | $12,150 | Implemented |
TT0130 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,989 | $20,000 | Implemented |
TT0130 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,191 | $6,041 | Implemented |
MZ0130 # 03 Y:2013 | 03 | 2013 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $17,041 | $5,200 | Implemented |
MZ0130 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,911 | $36,015 | Implemented |