IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
Reset
NAICS 333414 Heating Equipment (except Warm Air Furnaces) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0130 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $49,337 $60,000 Not Implemented
MZ0130 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,741 $0 Not Implemented
WV0463 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,159 $16,082 Implemented
WV0463 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,997 $14,290 Implemented
WV0463 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,058 $2,164 Not Implemented
WV0463 # 04 Y:2013 04 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,352 $1,000 Not Implemented
WV0463 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,730 $818 Not Implemented
WV0463 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,349 $2,378 Implemented
WV0463 # 07 Y:2013 07 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,250 $0 Not Implemented
WV0463 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,099 $5,677 Implemented
WV0463 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $933 $214 Implemented
WV0463 # 10 Y:2013 10 2013 IMPROVE LUBRICATION PRACTICES $560 $500 Implemented
WV0463 # 11 Y:2013 11 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $534 $61 Not Implemented
WV0463 # 12 Y:2013 12 2013 DEVELOP A REPAIR/REPLACE POLICY $116 $164 Not Implemented
WV0463 # 13 Y:2013 13 2013 DISCONNECT BALLASTS $59 $77 Implemented
BS0011 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,102 $973 Implemented
BS0011 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $4,008 $6,725 Implemented
BS0011 # 03 Y:2012 03 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $15,728 $29,500 Not Implemented
BS0011 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,878 $6,670 Not Implemented
BS0011 # 05 Y:2012 05 2012 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $8,243 $900 Not Implemented
BS0011 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $250 $600 Implemented
MZ0077 # 01 Y:2011 01 2011 INSTALL OCCUPANCY SENSORS $6,493 $1,100 Not Implemented
MZ0077 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $317 $110 Not Implemented
MZ0077 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $253 $110 Not Implemented
MZ0077 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,103 $2,400 Not Implemented