IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 333414 Heating Equipment (except Warm Air Furnaces) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0157 # 05 Y:2014 05 2014 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,840 $9,600 Implemented
MZ0157 # 04 Y:2014 04 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,223 $17,400 Not Implemented
MZ0157 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,149 $30,133 Implemented
MZ0157 # 02 Y:2014 02 2014 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $1,077 $10,750 Implemented
MZ0157 # 01 Y:2014 01 2014 INSULATE BARE EQUIPMENT $571 $601 Not Implemented
MZ0130 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,164 $1,000 Implemented
MZ0130 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,741 $0 Not Implemented
MZ0130 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $49,337 $60,000 Not Implemented
MZ0130 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,911 $36,015 Implemented
MZ0130 # 03 Y:2013 03 2013 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $17,041 $5,200 Implemented
MZ0130 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,092 $5,800 Not Implemented
MZ0077 # 07 Y:2011 07 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,741 $28,000 Not Implemented
MZ0077 # 06 Y:2011 06 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $38,690 $0 Not Implemented
MZ0077 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,655 $800 Not Implemented
MZ0077 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,103 $2,400 Not Implemented
MZ0077 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $253 $110 Not Implemented
MZ0077 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $317 $110 Not Implemented
MZ0077 # 01 Y:2011 01 2011 INSTALL OCCUPANCY SENSORS $6,493 $1,100 Not Implemented
MZ0016 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,548 $2,135 Not Implemented
MZ0016 # 03 Y:2007 03 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,312 $3,000 Not Implemented
MZ0016 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $1,120 Implemented