IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

570

matching recommendations
Reset
NAICS 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0789 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $63,136 $0 Implemented
GT0789 # 02 Y:2004 02 2004 INSTALL TIMERS AND/OR THERMOSTATS $3,090 $1,824 Implemented
GT0789 # 03 Y:2004 03 2004 DISCONNECT BALLASTS $639 $645 Implemented
GT0789 # 04 Y:2004 04 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,717 $300 Not Implemented
GT0789 # 05 Y:2004 05 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $21,400 $9,700 Implemented
GT0789 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,160 $2,400 Implemented
GT0789 # 07 Y:2004 07 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,570 $6,000 Implemented
GT0789 # 08 Y:2004 08 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $964 $2,900 Not Implemented
GT0789 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,800 $198,000 Implemented
OK0692 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,239 $2,275 Implemented
OK0692 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,206 $10,250 Not Implemented
OK0692 # 03 Y:2004 03 2004 USE COMPRESSOR AIR FILTERS $5,114 $7,875 Not Implemented
OK0692 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,221 $8,625 Implemented
OK0692 # 05 Y:2004 05 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,389 $6,675 Not Implemented
OK0692 # 06 Y:2004 06 2004 INSTALL SET-BACK TIMERS $81,447 $10,000 Implemented
OK0692 # 07 Y:2004 07 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $8,800 $0 Implemented
OK0692 # 08 Y:2004 08 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $17,464 $5,050 Not Implemented
OK0692 # 09 Y:2004 09 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $663,000 $130,000 Not Implemented
OK0692 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,577 $11,882 Implemented
OK0692 # 11 Y:2004 11 2004 INSTALL OCCUPANCY SENSORS $1,911 $1,690 Not Implemented
OK0691 # 01 Y:2004 01 2004 INSTALL EQUIPMENT TO MOVE PRODUCT $90,154 $5,782 Not Implemented
OK0691 # 02 Y:2004 02 2004 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $270,439 $2,825 Implemented
OK0691 # 03 Y:2004 03 2004 INSTALL SET-BACK TIMERS $6,531 $3,832 Implemented
OK0691 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,036 $559 Implemented
OK0691 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $265 $0 Implemented