IAC Assessment: TA0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2005
Principal Product Blowers and Fans
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 136
Plant Area (Sq.Ft.) 78,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,048
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,315 2,333,610 kWh $0.06
Electricity Demand $36,085 5,496 kW-months/year $6.57
Natural Gas $4,835 728 MMBtu $6.64
TOTAL ENERGY COSTS $173,235
RECOMMENDED SAVINGS* $39,515 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,300
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$17,820
Cost:
$1,035
- - - - $17,820 - -
-
kWh
-
-
kW-months/year
$17,820
-
$
02: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$9,270
Cost:
$2,660
$9,270 163,509 - - - - $9,270
163,509
kWh
-
-
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,300
Cost:
$530
$4,300 75,360 $1,000 150 - - $4,300
75,360
kWh
$1,000
150
kW-months/year
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,440
Cost:
$2,000
$2,440 43,204 - - - - $2,440
43,204
kWh
-
-
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,615
Cost:
-
$1,260 15,962 $355 53 - - $1,260
15,962
kWh
$355
53
kW-months/year
-
-
$
06: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$270
Cost:
-
- - $270 56 - - -
-
kWh
$270
56
kW-months/year
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,370
Cost:
-
$1,930 34,000 $440 67 - - $1,930
34,000
kWh
$440
67
kW-months/year
-
-
$
08: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$430
Cost:
-
$430 7,550 - - - - $430
7,550
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$39,515
Cost:
$6,225
$19,630 339,585 $2,065 326 $17,820 - $19,630
339,585
kWh
$2,065
326
kW-months/year
$17,820
-
$
TOTAL IMPLEMENTED Savings:
$5,300
Cost:
$530
$4,300 75,360 $1,000 150 - - $4,300
75,360
kWh
$1,000
150
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product