Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
570
matching recommendationsNAICS | 333415 | Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0941 # 08 Y:2020 | 08 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $105,492 | $696,247 | Not Implemented |
LE0477 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,091 | $0 | Not Implemented |
LE0477 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $179 | $80 | Implemented |
LE0477 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,343 | $40,000 | Not Implemented |
LE0477 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,531 | $5,300 | Implemented |
LE0477 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $23,914 | $96,000 | Implemented |
NL0015 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,693 | $189,100 | Implemented |
NL0015 # 02 Y:2017 | 02 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,416 | $0 | Implemented |
NL0015 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,079 | $12,500 | Not Implemented |
NL0015 # 04 Y:2017 | 04 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,800 | $0 | Implemented |
NL0015 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,190 | $4,500 | Implemented |
AS0446 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,695 | $180 | Implemented |
AS0446 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,288 | $1,482 | Not Implemented |
AS0446 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $982 | $950 | Not Implemented |
OK0973 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,201 | $28,109 | Not Implemented |
OK0973 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,650 | $9,471 | Not Implemented |
OK0973 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $534 | $2,111 | Not Implemented |
OK0973 # 04 Y:2017 | 04 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,431 | $12,360 | Not Implemented |
OK0973 # 05 Y:2017 | 05 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,172 | $0 | Not Implemented |
OK0973 # 06 Y:2017 | 06 | 2017 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $860 | $769 | Not Implemented |
OK0973 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,356 | $19,135 | Not Implemented |
OK0973 # 08 Y:2017 | 08 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,658 | $1,650 | Not Implemented |
OK0973 # 09 Y:2017 | 09 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,097 | $991 | Not Implemented |
OK0973 # 10 Y:2017 | 10 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,050 | $510 | Not Implemented |
OK0973 # 11 Y:2017 | 11 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,046 | $1,480 | Not Implemented |