Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 333415 | Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0477 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $23,914 | $96,000 | Implemented |
LE0477 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,531 | $5,300 | Implemented |
LE0477 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,343 | $40,000 | Not Implemented |
LE0477 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $179 | $80 | Implemented |
LE0477 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,091 | $0 | Not Implemented |
LE0417 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,844 | $1,000 | Implemented |
LE0417 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,659 | $62,300 | Implemented |
LE0417 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,120 | $22,015 | Implemented |
LE0417 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,602 | $25,000 | Implemented |
LE0417 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,687 | $1,868 | Not Implemented |
LE0417 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $715 | $500 | Implemented |
LE0417 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,317 | $46 | Not Implemented |
LE0265 # 01 Y:2007 | 01 | 2007 | UTILIZE OUTSIDE CONTRACTING | $45,000 | $7,800 | Implemented |
LE0265 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,557 | $58,273 | Not Implemented |
LE0265 # 08 Y:2007 | 08 | 2007 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $429 | $600 | Not Implemented |
LE0265 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $623 | $200 | Not Implemented |
LE0265 # 06 Y:2007 | 06 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $594 | $0 | Implemented |
LE0265 # 05 Y:2007 | 05 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,558 | $0 | Implemented |
LE0265 # 04 Y:2007 | 04 | 2007 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,367 | $46 | Not Implemented |
LE0265 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,608 | $860 | Implemented |
LE0265 # 02 Y:2007 | 02 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $10,266 | $2,250 | Implemented |