Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 333415 | Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1116 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $151,456 | $1,065,000 | n/a |
OK1116 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,007 | $7,840 | n/a |
OK1116 # 03 Y:2024 | 03 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $3,039 | $2,670 | n/a |
OK1116 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $17,160 | $7,800 | n/a |
OK1116 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,536 | $0 | n/a |
OK1116 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $38,052 | $31,569 | n/a |
OK1115 # 05 Y:2024 | 05 | 2024 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $4,659 | $47,850 | n/a |
OK1115 # 06 Y:2024 | 06 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,165 | $3,332 | n/a |
OK1115 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,084 | $2,944 | n/a |
OK1115 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $947 | $6,554 | n/a |
OK1115 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $17,916 | $166,007 | n/a |
OK1115 # 04 Y:2024 | 04 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $7,273 | $11,595 | n/a |
MI0442 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,002 | $70 | n/a |
MI0442 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,918 | $917 | n/a |
MI0442 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,720 | $159,280 | n/a |
MI0442 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,876 | $16,028 | n/a |
MI0442 # 02 Y:2024 | 02 | 2024 | METER WASTE WATER | $13,483 | $956 | n/a |
MI0442 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $16,134 | $240 | n/a |
GT0976 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $4,240 | $13,403 | n/a |
GT0976 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $273,272 | $5,081,734 | n/a |
GT0976 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $20,799 | $15,000 | n/a |
GT0976 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $375 | $200 | n/a |
GT0976 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $20,852 | $2,185 | n/a |
GT0976 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,289 | $800 | n/a |
GT0974 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $32,346 | $469,616 | n/a |