Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
837
matching recommendationsNAICS | 3335 | Metalworking Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0378 # 02 Y:2025 | 02 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $26,585 | $49,000 | n/a |
MZ0378 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $4,373 | $750 | n/a |
MZ0378 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,470 | $750 | n/a |
MZ0378 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $196,374 | $1,560,000 | n/a |
MZ0378 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,972 | $3,500 | n/a |
MZ0378 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,844 | $12,060 | n/a |
MU0068 # 06 Y:2025 | 06 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $529 | $0 | n/a |
MU0068 # 11 Y:2025 | 11 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $31 | $57 | n/a |
MU0068 # 12 Y:2025 | 12 | 2025 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $728 | $22,678 | n/a |
MU0068 # 10 Y:2025 | 10 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,486 | $80,718 | n/a |
MU0068 # 13 Y:2025 | 13 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,362 | $24,413 | n/a |
MU0068 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $585 | $3,626 | n/a |
MU0068 # 01 Y:2025 | 01 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $73,104 | $121,444 | n/a |
MU0068 # 03 Y:2025 | 03 | 2025 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $829 | $473 | n/a |
MU0068 # 02 Y:2025 | 02 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,526 | $9,755 | n/a |
MU0068 # 09 Y:2025 | 09 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $393 | $0 | n/a |
MU0068 # 07 Y:2025 | 07 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,415 | $0 | n/a |
MU0068 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $1,137 | $2,018 | n/a |
MU0068 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $972 | $26 | n/a |
IP0214 # 08 Y:2025 | 08 | 2025 | USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING | $9,428 | $9,599 | n/a |
IP0214 # 11 Y:2025 | 11 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,076 | $3,485 | n/a |
IP0214 # 12 Y:2025 | 12 | 2025 | STANDARDIZE MOTOR INVENTORY | $23,673 | $53,888 | n/a |
IP0214 # 13 Y:2025 | 13 | 2025 | REPLACE BOILER | $29,619 | $95,000 | n/a |
IP0214 # 01 Y:2025 | 01 | 2025 | CONVERT TO ELECTROSTATIC POWDER COATING | $114,298 | $0 | n/a |
IP0214 # 02 Y:2025 | 02 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $2,655 | $0 | n/a |