Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
179
matching recommendationsNAICS | 3335 | Metalworking Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0112 # 12 Y:2020 | 12 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $342 | $0 | Implemented |
CW0112 # 03 Y:2020 | 03 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,643 | $848 | Not Implemented |
CW0112 # 09 Y:2020 | 09 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $51,045 | $2,000 | Implemented |
CW0112 # 10 Y:2020 | 10 | 2020 | INCREASE USE OF AUTOMATION | $749,435 | $60,000 | Implemented |
CW0112 # 08 Y:2020 | 08 | 2020 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $7,871 | $14,588 | Not Implemented |
CW0112 # 11 Y:2020 | 11 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,024 | $6,471 | Not Implemented |
CW0112 # 13 Y:2020 | 13 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,095 | $16,500 | Implemented |
CW0112 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,658 | $100 | Implemented |
CW0112 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,912 | $330 | Implemented |
CW0112 # 05 Y:2020 | 05 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,268 | $3,429 | Not Implemented |
CW0112 # 06 Y:2020 | 06 | 2020 | TREAT AND REUSE RINSE WATERS | $15,861 | $10,000 | Implemented |
CW0112 # 04 Y:2020 | 04 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,678 | $800 | Implemented |
CW0112 # 07 Y:2020 | 07 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,966 | $800 | Implemented |
UD0960 # 10 Y:2017 | 10 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,121 | $0 | Not Implemented |
UD0960 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,390 | $1,000 | Implemented |
UD0960 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,808 | $0 | Implemented |
UD0960 # 14 Y:2017 | 14 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,599 | $9,362 | Not Implemented |
UD0960 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,385 | $0 | Implemented |
UD0960 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,179 | $97,386 | Not Implemented |
UD0960 # 07 Y:2017 | 07 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,266 | $3,000 | Not Implemented |
UD0960 # 06 Y:2017 | 06 | 2017 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $514 | $1,425 | Implemented |
UD0960 # 13 Y:2017 | 13 | 2017 | INSTALL OCCUPANCY SENSORS | $6,486 | $9,108 | Not Implemented |
UD0960 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $17,273 | $0 | Implemented |
UD0960 # 11 Y:2017 | 11 | 2017 | USE MINIMUM STEAM OPERATING PRESSURE | $826 | $0 | Not Implemented |
UD0960 # 08 Y:2017 | 08 | 2017 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $11,351 | $10,000 | Not Implemented |