IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 3335 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0188 # 02 Y:2017 02 2017 USE POWER DURING OFF-PEAK PERIODS $10,583 $100 Implemented
TT0188 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,331 $8,433 Not Implemented
TT0188 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,153 $890 Implemented
TT0188 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $684 $450 Not Implemented
TT0188 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $23,768 $97,975 Not Implemented
TT0178 # 04 Y:2016 04 2016 INSTALL TIMERS AND/OR THERMOSTATS $805 $250 Not Implemented
TT0178 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $329 $600 Not Implemented
TT0178 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $332 $125 Not Implemented
TT0178 # 03 Y:2016 03 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,598 $530 Not Implemented
TT0178 # 02 Y:2016 02 2016 APPLY FOR INVESTMENT INCENTIVES $4,193 $40 Implemented
TT0178 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,653 $3,050 Not Implemented
TT0103 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $35,332 $1,960 Not Implemented
TT0103 # 04 Y:2012 04 2012 STANDARDIZE MOTOR INVENTORY $0 $0 Not Implemented
TT0103 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,318 $5,300 Implemented
TT0103 # 02 Y:2012 02 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,152 $35,480 Not Implemented
TT0103 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,502 $0 Implemented
TT0083 # 06 Y:2011 06 2011 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $5,312 $3,825 Not Implemented
TT0083 # 01 Y:2011 01 2011 OPTIMIZE PLANT POWER FACTOR $9,142 $15,000 Implemented
TT0083 # 02 Y:2011 02 2011 INSTALL SKYLIGHTS $2,883 $36,500 Not Implemented
TT0083 # 03 Y:2011 03 2011 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,378 $1,200 Implemented
TT0083 # 04 Y:2011 04 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $337 $29,076 Not Implemented
TT0083 # 05 Y:2011 05 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $267 $1,370 Not Implemented
TT0056 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,872 $11,208 Not Implemented
TT0056 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,661 $45,225 Not Implemented
TT0056 # 03 Y:2010 03 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,445 $1,444 Not Implemented