Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
45
matching recommendationsNAICS | 3335 | Metalworking Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0128 # 04 Y:2006 | 04 | 2006 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $5,927 | $0 | Not Implemented |
TA0128 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $52,032 | $10,650 | Not Implemented |
TA0128 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,627 | $1,030 | Not Implemented |
TA0128 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,981 | $1,440 | Not Implemented |
WV0337 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,082 | $590 | Implemented |
WV0337 # 13 Y:2006 | 13 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $674 | $1,280 | Implemented |
WV0337 # 12 Y:2006 | 12 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,100 | $1,308 | Not Implemented |
WV0337 # 11 Y:2006 | 11 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,749 | $2,400 | Not Implemented |
WV0337 # 10 Y:2006 | 10 | 2006 | USE SYNTHETIC LUBRICANT | $1,777 | $0 | Implemented |
WV0337 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,846 | $2,185 | Not Implemented |
WV0337 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,981 | $80 | Implemented |
WV0337 # 06 Y:2006 | 06 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $2,233 | $760 | Implemented |
WV0337 # 05 Y:2006 | 05 | 2006 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,170 | $2,350 | Not Implemented |
WV0337 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,690 | $0 | Implemented |
WV0337 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $5,170 | $2,156 | Implemented |
WV0337 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,455 | $800 | Implemented |
WV0337 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,554 | $123,600 | Implemented |
UD0738 # 04 Y:2006 | 04 | 2006 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,084 | $0 | Implemented |
UD0738 # 01 Y:2006 | 01 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $91,800 | $6,000 | Implemented |
UD0738 # 02 Y:2006 | 02 | 2006 | RECOVER AND REUSE WASTE MATERIAL | $28,944 | $2,000 | Not Implemented |
UD0738 # 03 Y:2006 | 03 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $8,313 | $0 | Implemented |
UD0738 # 07 Y:2006 | 07 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,348 | $500 | Implemented |
UD0738 # 05 Y:2006 | 05 | 2006 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,819 | $0 | Not Implemented |
UD0738 # 06 Y:2006 | 06 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,479 | $1,700 | Not Implemented |
UD0738 # 08 Y:2006 | 08 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $859 | $0 | Implemented |